HA13 Task 1 - Schedule

I have made schedule for the this assignment and to manage my time and use it more efficiently. I will be updating the schedule every week since there could be slight changes to the schedule in case I wouldn't be able to stick to it. Shown below is my schedule for now.


Week 1

So far I haven't made any changes to the schedule since I am able to stick to it by completing the tasks that I am supposed to do.So for now I haven't changed the schedule yet.



Week 2

The Research and Ideas generation and the design pack took longer than expected making the time that i have to make the actual environment shorter. I will have to work faster on modelling to make up for time I lost.




Week 3

I was able to finish the work from week 3 as planned last week. For now I will be sticking to the plan since I have already started working on my 3D models using light wave. I have run into some problems exporting my illustration plan into lighwave modeler but was able resolve the issues wit the help of my teacher.




Week 4

I am running into issues with making the models because I have forgotten some of the functions in lightwave making me learn them again, but for now I am no behind schedule. I have made some models such as windows and doors.



Week 5

I have learnt the basic modelling functions for modeler but having to learn some blender because I am not able access lightwave at home because of license issues. I have learnt that I can export from blender so i am using it at home to make more basic models such as tables. I am behind on schedule for modelling because there is a lot more models to make than i planned before because I wanted my environment to be as much detailed as possible. I had to reduce he days given to present the design and replace it by having more time to make the flythrough build using the game engine.




Week 6

I am able to stick the plan previously made but is anxious about the time I have left for the presentation and environment build. I might have to change it up slightly to make the best use of all the time I have left.




Week 7

I am able to stick to the plan still but I am changing the time For the environment build buy reducing the time for evaluation because I am certain that I wouldn't be able to finish the project for the best of my ability if I don't manage my time. The evaluation should not take as much time I planned so I will be editing the schedule.


Week 8

I am able to stick the plan and i am certain that I can get all the work done in this state.


From This point onward I was able to stick to my schedule as I was able to finish and render my project on time. The schedule was not changed because of that reason.